Go Back. Email this page. Print this page.
 
SERVICE FINDER
In This Section
What Clients Say

“Please accept my thanks for all the hard work during this time and please extend this to the rest of your team.”

Siemens Enterprise Communications Limited


“Thank you for all your efforts to date.  You and your engineers are doing a fantastic job.”

FUJITSU


 
Hospitality & Speciality

Hospitality & Speciality

 
Mitchells Butlers

  • Full managed service for the entire Mitchell and Butler chain of 2000 outlets across the UK.
  • Infrastructure cabling.
  • IMAC services including 4 hour response to site.
  • Site surveys, configuration and installation services for new outlet openings/refurbishments.
  • Disposal services.
  • Roll-out to 2000 outlets of new back-office printers in under 10 weeks.
  • Configuration and installation of new back-office PCs across 2000 outlets.

 

Pizza Hut
  • Site survey/configuration/installation and infrastructure cabling services (data, electrical and voice) for all new store openings.
  • Ongoing moves and changes program across the Pizza Hut estate.
  • Services include the ultrasonic cleaning of systems for re-deployment for site refits. Each system deployed is site-specifically configured and tested at AVC’s facility prior to installation.

 

Whitbread
  • Configuration of PCs and distribution into spares loop for Premier Travel Inn.
  • Configuration and installation services for new Premier Travel Inn openings and David Lloyd Health Clubs, plus adds moves and changes.
  • Conversions of IT systems from Holiday Inns to Premier Inn brand.
  • All systems are pre-configured at AVC’s facility prior to dispatch and installation.

 

OIL & VINEGAR
  • Installation services of EPOS systems for new store openings in Holland and UK.

 

 

SONY
  • 30 engineers at peak to complete on-site engineering upgrades and migrations to desktops across three major office locations.
  • 2100 users' desktops in total, user-by-user migration of files to new operating platform, including roll-out of Outlook 2003 to all users.
  • AVC provided ongoing technical desk-side support services to all users.

 

Scottish and Southern Energy
  • Configuration/logistics and installation services for 4000 PCs across 60 locations in mainland UK.
  • Configuration of 400 training laptops and distribution to 27 hub locations across the mainland UK.
  • All units preconfigured and tested at AVC’s build centre prior to installation.

 

Hagemeyer


  • 7-year full managed service covering 4500 seats across 420 site locations (configuration and installation).
  • IMAC and desk-side support programme for all IT equipment.
  • Service includes fibre-optic and copper cabling installations.
 
BICSI Corporate MemberCITAFIABSIUKASUKWA